LAN/WAN Phase IV

Project Status

Date Posted: 1/22/2007 8:00:00 AM

Completed on Schedule
(will not be shown on future Bond Oversight Committee Status Reports)

Date Posted: 11/4/2005 2:30:00 PM

Project Title: FCC Local Area Network/Wide Area Network - Phase IV (Phases IV-A, IV-B, IV-C)
Funding Source: Measure E

Project Description: Phases I, II and III have provided fiber optic links to all buildings and to computer stations at the Library, Math Science Building, and Student Services Building. Phase IV-A provides connectivity to all classroom and faculty/student computer stations for the rest of the campus. Due to the complexity and size of Phase IV, and to minimize disruption to instruction, it has been developed into multiple bid packages for cross-connect rooms, and interior and exterior cabling. Phase IV-B is to purchase hardware to equip the cross-connect rooms. Phase IV-C is to provide a back-up generator for the District Office. The next phase will include connection of facilities east of the railroad and across Blackstone Blvd. to Clark Street and a back-up generator for Fresno City College.

Anticipated Completion Date: Phases IV-A, IV-B, IV-C completed on schedule

Status: Design is in progress on the futurephases.
Estimated Project Budget: Prepared by Arrigoni & Associates

Funding Source: Measure E – LAN / WAN – (Phase IV-A, IV-B, IV-C)

 

Estimated Project Budget

2002-05
Actual Expenditures

2005-06
Budget

2005-06
Expenditures to date

2005-06
Encum-brances

Total Expenditures

Design Services

199,281

158,568

40,713

40,713

0

199,281

Consultant Services

 

0

0

0

0

Fees & Other Charges

16,912

16,912

0

0

0

16,912

Construction & Equipment

1,961,247

1,884,452

76,795

73,497

0

1,957,949

Inspection & Testing

79,440

67,300

12,140

12,140

0

79,440

Total

2,256,880

2,127,232

129,648

126,350

0

2,253,582


Date Posted: 5/1/2006 8:00:00 AM

Project Title: FCC Local Area Network/Wide Area Network - Phase IV (Phases IV-A, IV-B, IV-C)
Funding Source: Measure E

Project Description: Phases I, II and III have provided fiber optic links to all buildings and to computer stations at the Library, Math Science Building, and Student Services Building. Phase IV-A provides connectivity to all classroom and faculty/student computer stations for the rest of the campus. Due to the complexity and size of Phase IV, and to minimize disruption to instruction, it has been developed into multiple bid packages for cross-connect rooms, and interior and exterior cabling. Phase IV-B is to purchase hardware to equip the cross-connect rooms. Phase IV-C is to provide a back-up generator for the District Office. The next phase will include connection of facilities east of the railroad and across Blackstone Blvd. to Clark Street and a back-up generator for Fresno City College.

Anticipated Completion Date: Phases IV-A, IV-B, IV-C completed on schedule

Status: Design is in progress on the future phases.

Estimated Project Budget: Prepared by Arrigoni & Associates

Funding Source: Measure E – LAN / WAN – (Phase IV-A, IV-B, IV-C)

 

Estimated Project Budget

2002-05
Actual Expenditures

2005-06
Budget

2005-06
Expenditures to date

2005-06
Encum-brances

Total Expenditures

Design Services

199,281

158,568

40,713

40,713

0

199,281

Consultant Services

 

 

0

0

0

0

Fees & Other Charges

16,912

16,912

0

0

0

16,912

Construction & Equipment

1,961,247

1,884,452

76,795

73,497

0

1,957,949

Inspection & Testing

79,440

67,300

12,140

12,140

0

79,440

Total

2,256,880

2,127,232

129,648

126,350

0

2,253,582


Date Posted: 1/24/2006 10:12:00 AM

Phases IV-A, IV-B, and IV-C are completed. Design is in progress on the future phases .

Funding Source: Measure E – LAN / WAN – (Phase IV-A, IV-B, IV-C)

 

Estimated Project Budget

2002-05
Actual Expenditures

2005-06
Budget

2005-06
Expenditures to date

2005-06
Encum-brances

Total Expenditures

Design Services

199,281
158,568
40,713
33,813
6,900
192,381

Consultant Services

0
0
0
0

Fees & Other Charges

16,912
16,912
0
0
0
16,912

Construction & Equipment

1,962,831
1,884,452
78,379
-9,529
87,908
1,874,923

Inspection & Testing

77,856
67,300
10,556
10,556
0
77,856

Total

2,256,880
2,127,232
129,648
34,840
94,808
2,162,072

Date Posted: 11/4/2005 2:39:00 PM

Funding Source: Measure E

Project Description: Phases I, II and III have provided fiber optic links to all buildings and to computer stations at the Library, Math Science Building, and Student Services Building. Phase IV-A provides connectivity to all classroom and faculty/student computer stations for the rest of the campus. Due to the complexity and size of Phase IV, and to minimize disruption to instruction, it has been developed into multiple bid packages for cross-connect rooms, and interior and exterior cabling. Phase IV-B is to purchase hardware to equip the cross-connect rooms. Phase IV-C is to provide a back-up generator for the District Office. The next phase will include connection of facilities east of the railroad and east of Blackstone Blvd. and a back-up generator for Fresno City College.

Anticipated Completion Date: Phases IV-B and IV-C are completed, Phase IV-A Fall 2005

Status: The cross-connect room construction/modernization, the cabling within the buildings, and the installation of the equipment for the cross-connect rooms and the Fresno City College distribution room are complete. Phases IV-A and IV-B were accepted at the September 6, 2005 Board Meeting. Design is in progress on the future phases.

Estimated Project Budget: Prepared by Arrigoni & Associates

Funding Source: Measure E – LAN / WAN - Phase IV (A)

 

Estimated Project Budget

2002-05
Actual Expenditures

2005-06
Budget

2005-06
Expenditures to date

2005-06
Encum-brances

Total Expenditures

Design Services

309,341

137,038

172,303

410

0

137,448

Consultant Services

49,673

0

49,673

0

0

0

Fees & Other Charges

13,593

3,981

9,612

0

0

3,981

Construction & Equipment

1,716,464

1,032,651

683,813

192,168

0

1,224,819

Inspection & Testing

115,892

67,300

48,592

10,316

0

77,616

Total

2,204,963

1,240,970

963,993

202,894

0

1,443,864

Funding Source: Measure E – LAN / WAN - Phase IV (B)

 

Estimated Project Budget

2002-05
Actual Expenditures

2005-06
Budget

2005-06
Expenditures to date

2005-06
Encum-brances

Total Expenditures

Design Services

0

0

0

0

0

0

Consultant Services

20,700

20,700

0

0

0

20,700

Fees & Other Charges

46,027

46,027

0

0

0

46,027

Construction & Equipment

509,000

509,000

0

0

0

509,000

Inspection & Testing

0

0

0

0

0

0

Contingency

0

0

0

0

0

0

Total

575,727

575,727

0

0

0

575,727

Funding Source: Measure E – LAN / WAN - Phase IV (C)

 

Estimated Project Budget

2002-05
Actual Expenditures

2005-06
Budget

2005-06
Expenditures to date

2005-06
Encum-brances

Total Expenditures

Design Services

9,570

9,570

0

0

0

9,570

Consultant Services

0

0

0

0

0

0

Fees & Other Charges

2,371

2,371

0

0

0

2,371

Construction & Equipment

95,700

95,700

0

0

0

95,700

Inspection & Testing

0

0

0

0

0

0

Contingency

0

0

0

0

0

0

Total

107,641

107,641

0

0

0

107,641

Funding Source: Measure E – LAN / WAN - Phase IV (D)

 

Estimated Project Budget

2002-05
Actual Expenditures

2005-06
Budget

2005-06
Expenditures to date

2005-06
Encum-brances

Total Expenditures

Design Services

84,358

0

84,358

0

0

0

Consultant Services

0

0

0

0

0

0

Fees & Other Charges

11,250

0

11,250

0

0

0

Construction & Equipment

843,575

0

843,575

0

0

0

Inspection & Testing

40,000

0

40,000

0

0

0

Contingency

42,179

0

42,179

0

0

0

Total

1,021,361

0

1,021,362

0

0

0


Date Posted: 1/18/2005 9:25:00 AM

The cross-connect room construction/modernization is complete. The cabling portion of the work within the buildings is 60% complete. Equipment for the cross-connect rooms has been received and is being racked for installation at the Fresno City College distribution room. Design is in progress on the future phases.

Date Posted: 3/10/2004 9:32:00 AM

The Board of Trustees at its September 3rd meeting selected and authorized the administration to enter into an agreement with Arrigoni and Associates, Inc. as the project engineer for this phase. The project is currently under design and is planned to be bid in March for an award at the April Board meeting.